February 5, 2008 Primary General Election
Clerk/Recorder
Coroner
County Board
ROE-22
Sheriff
State's Attorney
Treasurer
| County
Offices and Departments |
Emergency Services Disaster Agency
Health Department
Highway Department
Probation
Public Defender
Supervisor of Assessments
Veterans Assistance
Zoning
Clayberg Nursing Center
Emergency Medical Association
ETSB-911 |
Fulton County Zoning Office
(continued)
|
|
|
When a Building Permit is Required
|
|
It is necessary to obtain a building permit
prior to the commencement of any construction. No building shall
be erected, converted, enlarged, reconstructed, or structurally
altered except in conformity with the area regulations of the
district in which the building is located.
|
How to Obtain a Permit
|
Applications for building permits can be obtained at the
Fulton County Zoning & Community Development Office located
at 700 East Oak, Canton, IL 61520. Office hours are Monday
– Friday 8 a.m. to 5 p.m., or please call 309-647-1134 ext
235.
Email:
zoning@fultonco.org |
Required Information on a Permit
|
- Name, address and phone number of applicant and property
owner.
- County Parcel Identification Number (found on tax bill)
or a copy of the deed to the property (if newly purchased)
where construction is to take place.
- Driving directions to property.
- Estimated cost of construction.
- A Plot Diagram with all dimensions figured showing
accurately the size and exact location of all proposed
construction or activity to be included in the permit and of
all existing buildings on the property.
- If a septic and/or well are necessary, the applicant
should apply for the proper permits from the Fulton County
Health Department, 700 East Oak Street, Canton, IL.
(309-647-1134).
- No permit will be issued until the proper permit numbers
for the water supply and sewage disposal system are secured
from the Health Dept.
- Building permit fee, payable to “Fulton County.”
- Name of contractor and/or roofing license number.
- For Mobile Homes: provide a copy of the
registration/title.
|
Posting of the Permit
|
|
The permit shall be kept POSTED on the premises open to public
inspection for the duration of the work and until the completion
of the same. |
|
|
|
click here for more permit details |
|